Engineering. Electric power substations and power lines up to 400kV.

2
1
3
4
5
6
2
1
3
4
5
6

Our design engineers has successfully accomplished works:

• 400 – 110 kV transformer substations. Customers: transmission power network operator LITGRID, Lithuanian railways.
• 330 – 110 kV cable and overhead lines. Customer: transmission power network operator LITGRID.
• 110 – 150 kV TenneT transformer substations. Transmission power network operator TenneT, Netherlands;
• 110/10 kV, 110/35/10 kV transformer substations. Customer: Distribution network operator, ESO, VAO (Estonia).
• 110/20 kV, 110/25 kV wind power plant, railway traction substations. Customers: 4 Energia, Inter RAO, Lithuanian railways.